Zenku Test Management — User guide
Draft of the public documentation (2 Oct 2026). Wording matches the app's screens in version 7.2.0. The support assistant reads this file and TROUBLESHOOTING.md: keep them in step with the app.
1. Set up (Jira admin, 5 minutes)
Open Jira settings → Apps → Test management setup.
- Prepare Jira. Creates the "Test" issue type and the "Tests / is tested by" link type if they do not exist. An existing "Test" type (for example from Xray) is reused. Running it again is safe.
- Enable projects. Choose the projects that manage tests. Company-managed projects are configured automatically; team-managed projects need one manual step, which the page explains. Add sample tests creates six tests in a "Sample tests" folder and a "Sample cycle" to try things out.
- Show test steps on Test issues. Open a Test issue and select Test steps under the summary. As a Jira admin, choose Show for all work items in the panel menu so every Test shows its steps.
If the licence is not active, the app becomes read-only. No data is lost.
2. Tests and folders
Open a project and select Tests in the project sidebar.
- Create test: summary, type (Manual, Automated or Exploratory), folder and steps (action, data, expected result, in rich text with links).
- Folders: build a tree with + New folder; drag tests or use Move in the selection bar. "Tests without a folder" shows the rest.
- Filters: search summary and description, and add JQL for anything Jira can search.
- Bulk actions: select tests (to move, delete, add to a cycle, plan or set, or Export document… (PDF or Word).
- Preconditions: reusable set-up steps, shared by many tests (Preconditions button).
- Test sets: named groups of tests you add to cycles in one go.
- Datasets: give a test parameters (
${browser}in a step) and rows of values; each row is run as its own iteration. - Versions: save a version of a test's steps, dataset and preconditions; compare and restore it later. Runs already started keep the steps they ran.
- Requirements: link a test to a story or any issue ("tests"). The requirement then shows its coverage.
3. Cycles and plans
- Cycles (Cycles tab) group test runs for a version and environment. Add tests by selection, folder, set, plan or JQL; large cycles are filled in the background with visible progress.
- Test plans gather tests and the cycles that run them, and show each test's latest result across those cycles.
- Assign runs to testers and search the tests of a cycle.
4. Running a test
Open a run from the cycle.
- Set each step to Passed, Failed, Blocked or a custom status; the run status follows the steps.
- Add comments, actual results and evidence files.
- Create bug from a failed step: the bug is prefilled with the steps and linked to the run. Or link an existing issue.
- Timer: start and pause; the time spent appears in the cycle and reports. You can also type a duration (1h 30m).
- Exploratory tests have a charter instead of steps and a session timeline: notes, questions, issues found (with evidence and bugs).
5. Coverage, traceability and reports
- The Test coverage panel on any requirement shows Covered / Passing / Failing / Not run and the tests behind it.
- Coverage tab: requirements of a version or JQL, with their status. Bugs are not counted as requirements, so a bug raised from a failed test does not lower your coverage; tick Include bugs if you want them listed. The same applies to the traceability report.
- Reports tab: cycle progress, by tester and environment, history of a test, and the traceability report (requirement → tests → runs → defects), exportable to CSV and PDF.
- Dashboard gadget: add "Test cycle progress" to a Jira dashboard.
6. Automated results from CI
Jira settings → Apps → Test management setup → CI results.
-
Choose the project and Create token (shown once; store it as a secret, e.g.
TM_TOKEN), and copy the address (TM_URL). -
Send the report after your tests run, for example:
curl -sS -X POST "$TM_URL&project=PROJ&cycle=Nightly&version=2.0&environment=Chrome" \ -H "Authorization: Bearer $TM_TOKEN" -H "Content-Type: application/xml" \ --data-binary @target/surefire-reports/TEST-all.xmlSupported: JUnit XML (JUnit, pytest, Jest, Maven, Gradle, Cypress, Playwright…), TestNG, NUnit 2/3, xUnit.net v2, Robot Framework 6/7 (output.xml), Cucumber JSON and Xray JSON. The format is detected automatically.
-
Results with the same
cyclename go to the same open cycle. Tests are matched by Jira key or automation key; missing ones are created as automated tests (createMissing=falseto turn it off). -
Recent imports shows each upload: cases, passed, failed, tests created and why anything was not imported.
Reports over 5 MB: send one file per suite with the same cycle. Revoke a token at any time; pipelines using it get
401 from then on.
Reading results
Each test keeps its latest finished result in Jira, readable with JQL and the Jira REST API (your permissions apply; no extra token):
project = PROJ AND testLastResult = FAILED AND testLastRun >= -7d
Fields: testLastResult, testLastResultName, testLastRun, testLastCycle, testLastVersion,
testLastExecutor, testLastDefect. REST: GET /rest/api/3/issue/{key}/properties/test-management-result.
7. Import from Xray, TestRail or Zephyr
Tests page → Import tests. Upload the CSV exported from Xray (Test Case Importer format), TestRail or Zephyr.
The preview shows how many tests, steps, folders and preconditions will be created and how each column is read.
Import runs in the background (about 1,000 tests in 5 minutes); you can close the dialog. Importing the same file
again does not create duplicates. Examples: docs/samples/.
8. Administration
- Statuses: add run and step statuses (e.g. "Retest"), each counting as a built-in one; archive instead of delete.
- Environments: rename; delete unused ones.
- Storage: space used in the app's database (Atlassian limits it per site).
- Audit: every change to tests, cycles and runs is recorded; see a test's or cycle's History.
9. Keyboard and accessibility
All screens work with the keyboard (Tab, Enter, Escape and arrow keys in trees and pickers) and follow Jira's light
or dark theme. When running a test: P pass, F fail, B block, T to do for the current step; J/K or the
arrow keys move between steps; N opens the next test.
10. Limits
| Item | Limit |
|---|---|
| CI report | 5 MB per upload |
| Import file | 20 MB, 100,000 rows |
| Tests per project | Tested with 10,000+ |
| Cycle | Tested with 1,000 runs added in one go |
11. Plans: Standard and Advanced
- Standard: everything in this guide except the compliance pack (section 14), plus a small monthly AI allowance to try the AI features (section 13): about 16 test drafts or 50 cycle summaries a month for the whole site.
- Advanced: adds the compliance pack and the full AI allowance: 0.05 USD per Jira user per month (at least 5 USD) for the site. One person can use at most a quarter of the site's allowance in a month.
- A Jira admin sees the plan, the allowance and what has been used in Jira settings → Apps → Test management setup → AI. The allowance renews on the 1st (UTC).
- Prices are per Jira user per month and follow Atlassian's user tiers. The edition is changed in Jira settings → Apps → Manage apps. Saved compliance profiles and signatures are kept if a site leaves Advanced; the features switch off until it returns.
12. BDD (Gherkin) tests and dynamic plans
- BDD tests: create a test with type BDD and write its scenario in Gherkin (Given / When / Then; English, Portuguese, Spanish, French or German). Saving makes the test's steps, and for a Scenario Outline its dataset, from the scenario, so running, results, versions and reports work like any test. The editor warns about mistakes as you type and suggests steps already used in the project.
- Export .feature: select BDD tests (or a folder) and Export .feature: one file per folder, a
.zipif there are several. Each scenario carries@TEST_<key>, its labels and its requirements. - Import .feature…: into the folder you are in. A scenario with
@TEST_<key>updates that test; otherwise a BDD test with the same name in the same folder is updated, so importing again never creates duplicates. Other tags become labels; tags that are issue keys link the test to that requirement. The import hands the files back with the test keys, to put in your repository. - Dynamic plans: open a plan → Rule. A rule is a JQL over the project's tests plus conditions (last result, never run, not run for N days, risk class, category). Preview shows how many tests match before you save. The plan then keeps itself up to date: when you save, on Refresh now, when tests change in Jira (at most every 2 minutes) and every hour. Tests you add by hand stay; tests you take out by hand do not come back. Removing the rule keeps the tests.
13. AI features
AI runs on Atlassian-hosted models through Atlassian's Forge platform: nothing leaves Atlassian. A Jira admin can switch AI off for the site in Jira settings → Apps → Test management setup → AI, and lower (never raise) the monthly allowance. If the allowance is used up, the AI buttons explain it and everything else keeps working.
- Generate with AI (Tests tab): pick a requirement; the AI drafts test cases with steps. Review, edit and choose which to create; they are linked to the requirement. Nothing is created before you confirm.
- Prioritize (inside a cycle): every test gets a risk score from 0 to 100 (recent failures, results that keep changing, days since the last run, requirements or the test changed since, risk class, Jira priority, open bugs); hover a score to see why. The score needs no AI and is in every edition. With Let AI order the top tests against what changed (and a note such as release notes) the AI puts first the tests your changes may affect and says why. You can put the cycle in that order (tests already run go last).
- Summarize with AI (inside a cycle): a short summary of where the cycle stands, its problems grouped by likely cause, risks and next step, written from the results (numbers, failing step and actual result, notes, bugs, new versus repeated failures). It says "Out of date" when results change afterwards, and Copy as text gives Markdown. AI can be wrong: check before sharing.
14. Compliance pack (Advanced)
For teams that answer to auditors. A Jira admin chooses, per project, one or more profiles in Jira settings → Apps → Test management setup → Compliance profiles: Life sciences, Financial services, Automotive, Aerospace, Industrial and railway safety, Cybersecurity, Accessibility, Artificial intelligence. Profiles can be combined. The app helps you meet these standards; it does not certify you.
- Electronic signatures: each person sets a personal signing password (separate from Atlassian) the first time they sign. A signature records name, date and time, its meaning and a hash of what was signed. Changing the signed content afterwards shows the signature as changed. If the password is forgotten, another Jira admin removes it (Setup → Compliance profiles → Reset a signing password) and the person sets a new one; earlier signatures stay valid and the reset is written to the audit log.
- Second-person approval: cycles, test versions and releases are approved by someone other than who asked. Asking yourself is refused ("Someone other than who asked for the approval must decide it").
- Risk class, verification method, categories: on tests and requirements (for example ASIL for Automotive, IEC 62304 class for Life sciences). Requirements verified by something other than a test (inspection, analysis, demonstration) are signed as verified, with a note.
- Release readiness: in Reports → Release readiness, choose a Jira version: the checks (cycles planned, all runs finished, nothing failing, every requirement covered or verified, cycles approved, bugs closed) and, in controlled projects, a signed release approval. Approving with checks not met needs a justification.
- Evidence pack…: one PDF with the checks, approval, cycles, requirements by risk class, traceability matrix, test register and accessibility report, plus the matrix as CSV with its SHA-256, and an optional "Reviewed" signature.
- Accessibility report (WCAG 2.2 A/AA): per criterion, from the tests that check it; a person marks criteria "Not applicable" with a reason.
- Cycles of a controlled project cannot be closed or deleted by hand once they have signed runs.
15. Confluence
Optional. A Confluence admin connects the app in Confluence (Apps → Manage apps); data is the same as in Jira.
- Test report macro: in the Confluence editor type
/Test report, choose the project and a cycle (with its AI summary and failures) or a version's release readiness. It is live, and each reader sees it only if they can see the project in Jira. Exports to PDF and Word include it. - Publish to Confluence… (cycle menu, release readiness): creates a page with the report as it is now, in a space you choose. Use it for a record at a moment in time. A page title must be new in that space.
16. Getting help
- In Jira, open Rovo chat and choose the Test management support agent: it answers questions from this guide and, for Jira admins, can read the site's diagnostic. Or use Help on the Tests page, which searches this guide.
- A Jira admin can copy a diagnostic (version, plan, licence, jobs, recent errors, no test content) from Jira settings → Apps → Test management setup → Diagnostics and paste it in a support e-mail.
17. Support
E-mail: support@zenkulabs.com. Questions are first read by an AI assistant that works from this guide and the troubleshooting page; a person reviews every answer before it is sent, and decides on refunds, licences, security and legal questions. We answer within one working day (Western European time). Privacy policy: https://zenkulabs.com/privacy/. Security: https://zenkulabs.com/security/.